Dulux required modifications to a workshop floor within their Powder Coating factory to enable an upgrade to their machinery. The project required the design and construction of two structural elements;
- A concrete plinth to house a powder coating extruder and;
- A pit constructed in the existing floor for pipework and drainage infrastructure